Project Experiences by Application

Year Project Name Applied Technologies Capa Site
2015 Samsung Electronics
Hwaseong Plant S3-B UPW Facilities Construction UT3 Facilities Construction (Ph2)
Pretreatment System
– H/E
– AC
– 1st R/O, MDG
Make-Up System
– 2nd R/O
– CEDI
– TOC UV
Recovery System
– AC
– UV
– Recovery R/O
560m3/hr

459m3/hr

168m3/hr

Hwaseong
(Korea)
2015 LG Display
Paju Plant
P9 IT 20K Environmental Facilities Extension Project
DI System
– AC Tower
– SC Tower
– De-gasifier
– SC/SA Tower
– Polisher
– Hero Unit
– Pre-filter
– CDI/HDI Unit
6,700m3/day Paju
(Korea)
2015 LG Display
Nanjing China Plant
N3 Auto
DI System
– MMF
– AC
– HE
– Safety Filter
– R/O
– CEDI
– Cooler
– UV
– MF
1,200m3/day Nanjing
(China)
2014 Samsung Electronics
UPW Retrofit Project
Pretreatment System
– AC
– 1st R/O
– MDG
Make-Up System
– 2nd R/O
– CEDI
UPW Polishing System
– TOC UV
– Anion Polisher
– Polishing MDG
– Cooler
– MBPolisher
– UF
Recovery System
– AC
– Recovery R/O
Chemical injection Package
500m3/hr Giheung
(Korea)
2013 Samsung Electronics
Hwaseong Plant S3-B
Pretreatment System
– H/E
– AC
– H/E
– UV
–  Pre Filter
– 1st R/O
– 2nd R/O
– Brain R/O
Make-up Demi. Water System
– MDG
– CEDI
– CEDI
– TOC UV
– MBP
– MDG
Recovery Water & Chemical injection system
– Recovery A/C Tower
– Recovery Pre Filter
– Recovery R/O
– Chemical Injection
– Neutralization
 

1275m3/hr

 

954m3/hr

 

338m3/hr

 

 

 

Hwaseong
(Korea)
2013 Egypt ERC Refinery Project Raw Water Treatment Package
– Coagulation & Flocculation
– DAF
– Sand Filter
Demi. Water Treatment Package
– UF
– Recovery UF
– R/O
– MBP
– Chemical Injection
955m3/hr

 

805m3/hr

 

 

Egypt
2013 Dongwoo Fine-Chem
TS-2 PROJECT
DEMI.Water Treatment System
– AC
– H/E
– 1st R/O
UPW Treatment System
– 2nd R/O
– CEDI
– Cooler
– TOC UV
– Anion polisher
– MBP
– MDG
– UV
– UF
Waste Water Treatment System
Waste Water Reclaim System
– pH Control
– Aeration
– MBR,
– Air Separation
– R/O
6,312m3/day

 

4,584m3/day

 

400m3/day

 

4,992m3/day

Pyoungtaek (Korea)
2013 LG Display
(Guangzhou China Plant)
D-Project
A/C Filter
S.C Tower
Degasifier
HE R/O
Reject R/O
S.C/S.A Tower
MDG
Seal Water Cooler
TOC UV
Polisher
UF
25,000m3/day Guangzhou
(China)
2013 LG Display
M2 Make-Up Project
DEMI. & UPW SYSTEM
-A/C
– SC Tower
– De-gasifier
– HE R/O
– SC/CA Tower
– MDG
320m3/hr Paju
(Korea)

Year Project Name Applied Technologies Capa Site
2015 GS Power
Anyang Combined Heat & Power Plant
Raw Water Supply & Pretreatment System

Make-Up Demi. Water Treatment System

Reuse System

Wastewater Treatment System

960m3/hr

40m3/hr

135m3/hr

30m3/hr

Anyang
(Korea)
2015 Samsung Electronics
S3 Wastewater Machinery and Pipe Construction (Ph-2)
Wastewater Treatment System 12,000 m3/day Hwaseong
(Korea)
2013 Vietnam NSRP Project Wastewater Treatment System

– API, CPI, FFU PACKAGE, Coagulation & Flocculation, D.A.F,
Biological Treatment Package, Aeration, Clarifier,
Tertiary Oxidation Package, Ozone System,

Tertiary Physicochemical Treatment Package,
Sludge Dewatering Package,

Chemical Dosing System,
Caustic Oxidation System

700m3/hr Vietnam
2013 Egypt ERC Refinery Project Waste water treatment system
– Oil Separator, CPI, Equalization,
pH Adjustment & Coagulation & Flocculation, D.A.F, Aeration, Clarifier, Sand Filter, A/C Filter, Thickener, Dehydrator,
Spent Caustic OZONE system,
Chemical Dosing System
425m3/hr Egypt
2013 Egypt ERC Refinery Project Condensate Polisher Package
– Condensate A/C Filter, Condensate Polisher ,
Chemical Dosing
230m3/hr Egypt
2013 Dongwoo Fine- Chem TS-2 Project UPW Facility and Wastewater Treatment Plant Construction DEMI.Water treatment System
– A/C, H/E, 1st R/O,
UPW Treatment System
– 2nd R/O, CEDI, Cooler, TOC UV, Anion polisher, MBP,
MDG , UV , UF unit
Waste Water Treatment System
Waste Water Reclaim System
– pH Control Tank, Aeration, MBR, Air Separation, R/O
6,312m3/day

 

4,584m3/day

 

 

400m3/day

 

4,992m3/day

Pyoungtaek
(Korea)
2012 Sichuan Hyundai Motor Co., Ltd. Water and Wastewater Treatment System Water Treatment System
Waste Water Treatment System
– pH Control & Coagulation & Flocculation, Sedimentation, MMF, Chelate Resin Tower,
PH Control & Coagulation & Flocculation, DAF,
Sand Filter, ED,
pH Control & Coagulation & Flocculation, ED, DAF, Aeration, ED, Sedimentation, Belt Press
1,440m3/day

600m3/day

 

 

1,150m3/day

400m3/day

Sichuan
(China)

Year Project Name Applied Technologies Capa Site
2012 POSCO FINEX 3rd New Condensate Vacuum System BFG Condensate Vacuum Transfer System 1000 Pohang
2011 Hyundai Mipo Dockyard Co., Ltd. Vacuum Wastewater Transfer System Vacuum Wastewater Transfer System 180m3/hr Ulsan
2009 Namgang Dam Vacuflow System -Aneui Village Vacuflow System
-Songgye Village Vacuflow System
95m3/day
120m3/day
Namgang Dam
2009 Samsung Electronics Gumi Plant Vacuflow System -Rainwater and wastewater pipe separation
-Mediation Pumping Station
Gumi
2008 Daecheong Dam Vacuflow System -Chogang Village Vacuflow System
-Chupungnyeong Village Vacuflow System
-Sinpyeong Village Vacuflow System
99m3/day
136m3/day
96m3/day
Daecheong Dam
2006 Hyundai Heavy Industries Co., Ltd. Vacuflow System -Ocean Plant Vacuum Pipe Length: 2,300m
Water Collection Capacity
Vibration Value Pot Quantity: 12EA
-Main Plant Zone 1
Vacuum Pipe Length : 4,500m
Water Collection Capacity
Vibration Value Pot Quantity: 27EA
– Main Plant Zone 2
Vacuum Pipe Length : 5,000m
Water Collection Capacity
Vibration Value Pot Quantity: 38EA
952ℓ/min

1,478ℓ/min

2,570ℓ/min

Ulsan

Year Project Name Applied Technologies Capa Site
2013 LG Display Gumi P61 LTPS Effluent Reuse System MBR, RO 20,000m3/day Gumi
(Korea)
2011 LG Display
Effluent Reuse Facilities Construction
Equalization, pH Control, Aeration, MBR, RO 10,000m3/day Gumi
2010 LG Display
Environmental Facilities 2nd Reuse Facilities
AC, JMF, RO 14m3/hr Gumi

+ Demi & Ultra-pure water

Year Project Name Applied Technologies Capa Site
2015 Samsung Electronics
Hwaseong Plant S3-B UPW Facilities Construction UT3 Facilities Construction (Ph2)
Pretreatment System
– H/E
– AC
– 1st R/O, MDG
Make-Up System
– 2nd R/O
– CEDI
– TOC UV
Recovery System
– AC
– UV
– Recovery R/O
560m3/hr

459m3/hr

168m3/hr

Hwaseong
(Korea)
2015 LG Display
Paju Plant
P9 IT 20K Environmental Facilities Extension Project
DI System
– AC Tower
– SC Tower
– De-gasifier
– SC/SA Tower
– Polisher
– Hero Unit
– Pre-filter
– CDI/HDI Unit
6,700m3/day Paju
(Korea)
2015 LG Display
Nanjing China Plant
N3 Auto
DI System
– MMF
– AC
– HE
– Safety Filter
– R/O
– CEDI
– Cooler
– UV
– MF
1,200m3/day Nanjing
(China)
2014 Samsung Electronics
UPW Retrofit Project
Pretreatment System
– AC
– 1st R/O
– MDG
Make-Up System
– 2nd R/O
– CEDI
UPW Polishing System
– TOC UV
– Anion Polisher
– Polishing MDG
– Cooler
– MBPolisher
– UF
Recovery System
– AC
– Recovery R/O
Chemical injection Package
500m3/hr Giheung
(Korea)
2013 Samsung Electronics
Hwaseong Plant S3-B
Pretreatment System
– H/E
– AC
– H/E
– UV
–  Pre Filter
– 1st R/O
– 2nd R/O
– Brain R/O
Make-up Demi. Water System
– MDG
– CEDI
– CEDI
– TOC UV
– MBP
– MDG
Recovery Water & Chemical injection system
– Recovery A/C Tower
– Recovery Pre Filter
– Recovery R/O
– Chemical Injection
– Neutralization
 

1275m3/hr

 

954m3/hr

 

338m3/hr

 

 

 

Hwaseong
(Korea)
2013 Egypt ERC Refinery Project Raw Water Treatment Package
– Coagulation & Flocculation
– DAF
– Sand Filter
Demi. Water Treatment Package
– UF
– Recovery UF
– R/O
– MBP
– Chemical Injection
955m3/hr

 

805m3/hr

 

 

Egypt
2013 Dongwoo Fine-Chem
TS-2 PROJECT
DEMI.Water Treatment System
– AC
– H/E
– 1st R/O
UPW Treatment System
– 2nd R/O
– CEDI
– Cooler
– TOC UV
– Anion polisher
– MBP
– MDG
– UV
– UF
Waste Water Treatment System
Waste Water Reclaim System
– pH Control
– Aeration
– MBR,
– Air Separation
– R/O
6,312m3/day

 

4,584m3/day

 

400m3/day

 

4,992m3/day

Pyoungtaek (Korea)
2013 LG Display
(Guangzhou China Plant)
D-Project
A/C Filter
S.C Tower
Degasifier
HE R/O
Reject R/O
S.C/S.A Tower
MDG
Seal Water Cooler
TOC UV
Polisher
UF
25,000m3/day Guangzhou
(China)
2013 LG Display
M2 Make-Up Project
DEMI. & UPW SYSTEM
-A/C
– SC Tower
– De-gasifier
– HE R/O
– SC/CA Tower
– MDG
320m3/hr Paju
(Korea)

+ Wastewater Treatment

Year Project Name Applied Technologies Capa Site
2015 GS Power
Anyang Combined Heat & Power Plant
Raw Water Supply & Pretreatment System

Make-Up Demi. Water Treatment System

Reuse System

Wastewater Treatment System

960m3/hr

40m3/hr

135m3/hr

30m3/hr

Anyang
(Korea)
2015 Samsung Electronics
S3 Wastewater Machinery and Pipe Construction (Ph-2)
Wastewater Treatment System 12,000 m3/day Hwaseong
(Korea)
2013 Vietnam NSRP Project Wastewater Treatment System

– API, CPI, FFU PACKAGE, Coagulation & Flocculation, D.A.F,
Biological Treatment Package, Aeration, Clarifier,
Tertiary Oxidation Package, Ozone System,

Tertiary Physicochemical Treatment Package,
Sludge Dewatering Package,

Chemical Dosing System,
Caustic Oxidation System

700m3/hr Vietnam
2013 Egypt ERC Refinery Project Waste water treatment system
– Oil Separator, CPI, Equalization,
pH Adjustment & Coagulation & Flocculation, D.A.F, Aeration, Clarifier, Sand Filter, A/C Filter, Thickener, Dehydrator,
Spent Caustic OZONE system,
Chemical Dosing System
425m3/hr Egypt
2013 Egypt ERC Refinery Project Condensate Polisher Package
– Condensate A/C Filter, Condensate Polisher ,
Chemical Dosing
230m3/hr Egypt
2013 Dongwoo Fine- Chem TS-2 Project UPW Facility and Wastewater Treatment Plant Construction DEMI.Water treatment System
– A/C, H/E, 1st R/O,
UPW Treatment System
– 2nd R/O, CEDI, Cooler, TOC UV, Anion polisher, MBP,
MDG , UV , UF unit
Waste Water Treatment System
Waste Water Reclaim System
– pH Control Tank, Aeration, MBR, Air Separation, R/O
6,312m3/day

 

4,584m3/day

 

 

400m3/day

 

4,992m3/day

Pyoungtaek
(Korea)
2012 Sichuan Hyundai Motor Co., Ltd. Water and Wastewater Treatment System Water Treatment System
Waste Water Treatment System
– pH Control & Coagulation & Flocculation, Sedimentation, MMF, Chelate Resin Tower,
PH Control & Coagulation & Flocculation, DAF,
Sand Filter, ED,
pH Control & Coagulation & Flocculation, ED, DAF, Aeration, ED, Sedimentation, Belt Press
1,440m3/day

600m3/day

 

 

1,150m3/day

400m3/day

Sichuan
(China)

+ Vacuflow system

Year Project Name Applied Technologies Capa Site
2012 POSCO FINEX 3rd New Condensate Vacuum System BFG Condensate Vacuum Transfer System 1000 Pohang
2011 Hyundai Mipo Dockyard Co., Ltd. Vacuum Wastewater Transfer System Vacuum Wastewater Transfer System 180m3/hr Ulsan
2009 Namgang Dam Vacuflow System -Aneui Village Vacuflow System
-Songgye Village Vacuflow System
95m3/day
120m3/day
Namgang Dam
2009 Samsung Electronics Gumi Plant Vacuflow System -Rainwater and wastewater pipe separation
-Mediation Pumping Station
Gumi
2008 Daecheong Dam Vacuflow System -Chogang Village Vacuflow System
-Chupungnyeong Village Vacuflow System
-Sinpyeong Village Vacuflow System
99m3/day
136m3/day
96m3/day
Daecheong Dam
2006 Hyundai Heavy Industries Co., Ltd. Vacuflow System -Ocean Plant Vacuum Pipe Length: 2,300m
Water Collection Capacity
Vibration Value Pot Quantity: 12EA
-Main Plant Zone 1
Vacuum Pipe Length : 4,500m
Water Collection Capacity
Vibration Value Pot Quantity: 27EA
– Main Plant Zone 2
Vacuum Pipe Length : 5,000m
Water Collection Capacity
Vibration Value Pot Quantity: 38EA
952ℓ/min

1,478ℓ/min

2,570ℓ/min

Ulsan

+ Reclaiming system

Year Project Name Applied Technologies Capa Site
2013 LG Display Gumi P61 LTPS Effluent Reuse System MBR, RO 20,000m3/day Gumi
(Korea)
2011 LG Display
Effluent Reuse Facilities Construction
Equalization, pH Control, Aeration, MBR, RO 10,000m3/day Gumi
2010 LG Display
Environmental Facilities 2nd Reuse Facilities
AC, JMF, RO 14m3/hr Gumi